The flagship
320,000 sq ft. Eleven zones. One logistics spine.
Zones 3–6 are commissioned by the anchor partner in that vertical, on their own controllers and safety stack. Industry bays are real, not representative.
Site plan
Walk the campus
Select a marker to read the zone brief.

Z1 · The Mirror
Design principle
Failure is the curriculum
Bays are instrumented to inject faults, not to avoid them. The failure library — not the classroom — is the core IP.
Sensor and comms degradation
LiDAR, GNSS and camera spoofing, degraded links, latency injection on live teleoperation.
Mechanical fault injection
Actuator faults, thermal derating, calibration drift and unannounced tooling failure.
ICS-level attack
Zone 7 mirrors the OT stack of every production zone and terminates in real motors and valves behind hard interlocks.